Reinforcing and waterproofing the foundation. Developing a new sewage plan and system, addressing the project's specific requirements while carefully accounting for existing site constraints.
Initial demolition phase: removing all non-structural elements and identifying and isolating existing utility lines.
Using the photographed space to create a new layout that serves two master bedrooms.
New build in process: sectioning of bathroom 01.
New build; partitioning the new bathrooms.
Bathroom 02 new entrance, along with integrated built-in closets, optimizing functionality and spatial efficiency.
New window openings
Mid-tiling process
Bathroom 02 tiled and grouted.
Bathroom 01 tiled and grouted.
Process of uncovering original stone walls: working in sections to score the plaster and remove it.
The uncovered stone walls. The result after: sandblasting to effectively clean the stone and reveal its original texture & filling in the in between surfaces with mortar.